Well Guys Grandson and I have been spending time in the Aircraft Factory. :D
The first Project post http://www.rugerforum.com/phpBB3/viewtopic.php?f=6&t=268995
Wings are assembled and ready for cover.
We have installed controls, stringers, trim system, baggage, and starting on fuel lines in the fuselage.
The first Project post http://www.rugerforum.com/phpBB3/viewtopic.php?f=6&t=268995
Wings are assembled and ready for cover.
We have installed controls, stringers, trim system, baggage, and starting on fuel lines in the fuselage.