Xdm40rajuy
Bearcat
In the load development process, there is nothing worse than waiting for your barrel to cool. For all of you who roll your own, here is a simple yet effective way to cool down your barrel. Now after I am going through my load development, it only takes a little more than 5 minutes to cool my barrel. Which speeds up my load development process. I went to Walmart and bought a air mattress pump for $10, then went to Lowes and purchased 2 feet of 5/8 i.d. tubing.
I simply inserted the tube inside of the nozzle that goes in the pump. Put the hose over the barrel and turn it on. That's it.
I simply inserted the tube inside of the nozzle that goes in the pump. Put the hose over the barrel and turn it on. That's it.